The structure of full precast concrete floor plate is a plate-making system by using one hundred percent precast, concrete in print first and then mounted on project location. precast concrete production process can be done in the project area or at a separate location taking into account the terms of delivery. This could be one way to speed up the implementation of development, after we discuss about half slab plate method, the method bondek plate and conventional systems. In terms of cost is also cheaper as long as the production is made saving or buying from suppliers who do not offer a concrete high price :-), ok we just started to discuss concrete floor plate is 100% precast :-)Pictures full precast concrete slab

Disadvantages method of full precast concrete slab
1).  Workmanship depends on heavy equipment, need to be taken into account if the precast concrete is still safe when lifted with heavy equipment (eg tower cranes or crane car).
2). If the project site located in urban areas, and precast concrete is produced in a separate area so there is the possibility of the delivery process can only be done at night or certain hours, but not necessarily when the material comes can be directly installed, these conditions require the setting stock temporary storage.
Excess method full precast concrete slab
1). Faster processing time because it can be manufactured early and stay stringing at the project site. 2). Cost-effective formwork floor plate. reduce the use of wood, plywood, scaffold scaffolding etc that should be available when using conventional methods.
3
). Results neater job because there is no wishy due plywood formwork joint meeting.
4
). Because it does not use wood, it has run a green building program in order to preserve the earth.

sequence workmanship

 a).
Manufacture shop drawing floor plate.
 b). Production of precast concrete plate.
 c). Installation of the column formwork, formwork cast columns and unloading.
 d). Installation and pembesian beam formwork, scaffolding installation of the floor plate.
 e). Installation of precast concrete slab above the beam.
 f). Cast beams and the beams above the floor plate.

Similarly, the full picture of the precast method on this floor plate, may reference a very simple this can be useful for colleagues all :-)............