Calculate foundation TC

Construction of high-rise building requires a means of heavy equipment for mobilization of equipment and materials to the upper floor and vice versa, the means for transport can be car crane that can move, or within one point with a tower crane, the lifting equipment that has advantages and disadvantages each in accordance with the building that will be done, for example, does not require a car crane foundation but adoptive capacity is not too large, while the tower crane with a strong foundation requires a greater lift than the crane car.To build a high-rise building with a capacity of work that is not too big of course, is a heavy price if it had to buy a tower crane new, with this condition then utilized businessman supplier of heavy equipment as a good chance to provide rental services Toer crane during the construction progresses, the rental price Toer crane can be agreed upon per month or for a development contract at a price that has been through negotiation and supply contracts are recorded in the letter of tower crane leasing tool.
Specification of the size, material, and the material foundation of the tower crane is usually provided by the supplier or manufacturer of the tool tenant tower crane, but the condition of the building work that is different from different locations so that the necessary calculations and redesign the structure of the tower crane foundation.Some of the reasons that cause the execution of the calculation of the foundation structure TC among others:

 
Field conditions where the structure of the tower crane was set up does not comply with the specifications given by the foundation needs tower crane manufacturers.As a Value Engineering as a cost saving effort TC foundation structure as cheaply as possible, but still strong enough to withstand the load strktur tower crane working on it during construction work in progress.As an annex to the permit related government institutions, that the foundation and the tower crane will operate later in accordance with safety procedures and deserve to be used as a development tool.As a contractor development efforts, that the foundation of the TC to be done already powerful to use, so with the approval of the TC foundation calculations, the contractor gets the cost savings or term profit structure :-)Fad counting only :-)

One thing that is troublesome in foundation work tower crane may lie in the pembobokan concrete after completion of the use of the tower crane, the size of the foundation up to several meters as well as the quality of the concrete which is quite loud, of course, a new problem for menyelesiakan cleaning work re-foundation of the tower crane that is often the target of use of the building after completion of construction required in the near future, efforts such as the acceleration of the deployment of a reliable handyman sleep, the addition of chemicals to facilitate sleep foundation of tower cranes, and other efforts, perhaps this problem will continue to occur and keep repeating until the advent of new technology foundation tower crane



0 komentar:

Posting Komentar

Copyright © 2012 indonesian civil engineering All Right Reserved